Appendix 6: Extreme Heat Checklist |
|
|
|
|
This checklist is intended to be used in conjunction with the All Hazards Checklist in Appendix 1.
|
PHASE 1 – PREPARATION
|
Not Started
|
In Progress
|
Complete
|
|
Install window air conditioners snugly.
|
□
|
□
|
□
|
|
Make sure the facility is properly insulated.
|
□
|
□
|
□
|
|
Consider keeping storm windows installed throughout the year.
|
□
|
□
|
□
|
|
Check air-conditioning ducts for proper insulation.
|
□
|
□
|
□
|
|
Protect windows from the morning or afternoon sun.
|
□
|
□
|
□
|
|
Use attic fans, when installed.
|
□
|
□
|
□
|
|
Close any registers that may allow heat inside. Install temporary reflectors, such as aluminum foil covered cardboard, in windows and skylights to reflect heat back outside.
|
□
|
□
|
□
|
|
PHASE 2 – IMPACT
|
Not Started
|
In Progress
|
Complete
|
|
Reduce, eliminate or reschedule strenuous activities at your facility for the coolest part of the day, which is usually in the morning between 4:00 a.m. and 7:00 a.m. Cancel all activities if the facility is not air-conditioned.
|
□
|
□
|
□
|
|
Encourage individuals to avoid too much sunshine, to drink plenty of fluids, stay indoors, use sunscreen, and wear loose-fitting, lightweight, light-colored clothing and hats.
|
□
|
□
|
□
|
|
Conserve electricity not needed to keep the facility cool and do not cool the facility when it is not in use.
|
□
|
□
|
□
|
|
Vacuum air conditioner filters weekly during periods of high use.
|
□
|
□
|
□
|
|
PHASE 3 – IMMEDIATE RESPONSE
|
Not Started
|
In Progress
|
Complete
|
|
Check on all congregation members or members of the immediate community who do not have air conditioning or who spend much of their time alone.
|
□
|
□
|
□
|
|
Consult the All Hazards Checklist in Appendix 1 for additional actions to be accomplished during this phase.
|
□
|
□
|
□
|
|
PHASE 4 – RELIEF
|
Not Started
|
In Progress
|
Complete
|
|
Consult the All Hazards Checklist in Appendix 1 for actions to be accomplished during this phase.
|
□
|
□
|
□
|
|
PHASE 5 – RECOVERY
|
Not Started
|
In Progress
|
Complete
|
|
Consult the All Hazards Checklist in Appendix 1 for actions to be accomplished during this phase.
|
□
|
□
|
□
|
|